Residential Electrical Panel Upgrade Checker
Do I need an electrical panel upgrade? Checks whether your existing panel can take an EV charger, heat pump or induction range, using the real code load-calculation methods rather than a rule of thumb.
Your electrical panel
Advanced / Custom Input — my panel
About the home
Advanced / Custom Input — about the home
What you already have
These start at typical values. Change any that do not match, or set one to 0 if you do not have it.
Advanced / Custom Input — existing loads
What you want to add
Advanced / Custom Input — new loads
Load management
Advanced / Custom Input — load management
Advanced / Custom Input — override any assumption
The metered method — NEC 220.87
If you can get your highest demand over the last 12 months from the utility or a smart meter, this is the most accurate method there is — and it usually gives far more headroom than a calculation from scratch. Leave it at 0 to skip it.
NEC demand factors
Canadian Electrical Code — CSA C22.1 Section 8
Germany — DIN 18015-1 Annex A
General IEC estimate — conservative allowances
This country’s own diversity table is not encoded yet, so these deliberately cautious allowances are used instead. They will tend to over-estimate. Change any of them if you know your local figures.
BS 7671 diversity — IET On-Site Guide Appendix A
AS/NZS 3000 Appendix C — Table C1 column 2
Your own parameter
Anything the fields above do not cover — a workshop sub-feed, a hot tub, a grow tent, a second kitchen. Positive adds load; negative removes it.
Result
Fill in your panel and loads, then press “Check my panel”.
Estimate only — verify with a licensed electrician/engineer and your local code authority before final installation.